Projects

The Farnley Academy

The Farnley Academy Asquith Building

£850k

The Farnley Academy Asquith Building project involved completely removing the UPVC external façade of the Asquith building, which dates back to the 1970's, and replacing it with new insulated timber frame walls with a STO render finish.
The ground floor brick faced cavity walls were raised, new aluminium double glazed curtain walling, windows and doors were installed throughout along with a complete single ply membrane re-roof.
The building now looks modern and benefits significantly from it's vastly improved thermal properties, air tightness & weather tightness.

Boston Spa Academy

Boston Spa Academy Performing Arts

£1.6m

Construction of the new performing arts building included formation of the steel framed hall, ancillary rooms, new plant room and new school reception link building. The project also involved remodelling the internal areas of the existing building to form new student toilets, meeting rooms and offices.

Mobirise

Airedale Academy Asbestos Removal Ph1

£690k

Phase 1 included for the removal of the asbestos to the walls and ceilings of the 3-storey MET block, construction of new walls and layout alterations, full re-wire to enable a fire alarm installation to the block and installation of all new finishes, all previously unable to be undertaken due to the presence of asbestos.

Mobirise

Former Park Mills

£2.2m

Conversion of an existing mill complex into 27 1 & 2 bedroom apartments and 10 new build town houses for sale.

Mobirise

Westgate Academy

£590k

Design and construction, including archaeological excavation, of a new classroom block with two classrooms, toilet facilities, external play store and link corridor.

© Copyright 2021 Aspect Building Solutions Ltd. All Rights Reserved.
Privacy Policy - Terms and Conditions
Aspect Building Solutions Ltd, Wentworth House, Turnberry Park Road, Morley, Leeds, LS27 7LE

Easiest Website Builder